HONGYUAN WATERPROOF TECHNOLOGY GROUPHDPE MEMBRANES OEM & PRIVATE LABEL

A CONNECTED WATERPROOFING SYSTEM

How pre-applied HDPE waterproofing works

The membrane is installed before concrete is placed. As the concrete bonds to the membrane, the interface helps limit pathways for lateral water migration between the waterproofing and the structure.

A physical water barrier

The HDPE sheet provides the primary waterproofing layer.

A bonded interface

Bond quality depends on a clean surface and suitable concrete placement.

Continuity at every detail

Joints, penetrations and corners need coordinated detailing.

PRE-APPLIED SYSTEM / CONCEPTSECTION A—A
From top to bottom: structural concrete, bonded interface, HDPE membrane and prepared substrate.Structural concreteBonded interfaceHDPE layerSubstrate

Concept only; not to scale. Final build-up and compatible materials must follow the project design and approved installation method.

FROM MATERIAL TO MEMBRANE

From material
to membrane.

Look beyond the finished roll. Confirm the specification, membrane build-up and installation requirements before procurement.

Read the complete product guide
Membrane production facility presentation image from the supplied materials
Hongyuan membrane production facility

HDPE MEMBRANE SELECTION

What to check before specifying a membrane

What does HDPE self-adhesive waterproofing mean?

HDPE means high-density polyethylene. In these pre-applied membranes, the HDPE sheet forms the water barrier and the adhesive system bonds to freshly placed concrete. Bonding to concrete and joining adjacent sheets are separate functions: choose the specified adhesive-jointed or heat-welded system.

Is pre-applied the same as peel-and-stick?

No. Pre-applied describes installation before structural concrete is poured. Do not assume a membrane designed to bond to fresh concrete is suitable for sticking onto an existing wall. Confirm the construction sequence and substrate before ordering.

How should I choose membrane thickness?

Use the project specification and the complete tested configuration, including HDPE sheet thickness, puncture resistance, jointing and concrete adhesion. Total thickness alone does not establish suitability for the groundwater pressure or site conditions.

What should an OEM enquiry include?

State your target market, membrane type, required thickness, quantity and destination, together with label language and packaging requirements. Ask for the corresponding test reports and written confirmation of available formats.

Compare HDPE membrane specifications · Review installation guidance · Discuss OEM supply

GET IN TOUCH

Send an enquiry

Tell us about your project or OEM requirements.

To: ellen@waterproofingbest.com
Your enquiry is processed by FormSubmit and emailed to our team. We will reply to the email address you provide. Privacy notice.